How to process the execution of Shallow Foundation work on construction site

Implementation/Execution of foundation task/work is pretty vital for structure. Furthermore, foundation is the primary part of the construction which gets the entire loads from the topside/superstructure.

Furthermore, it performs/plays vital function/role to protect the structure. The measures or process of foundation task/work at the site are added in the article.

This phase of the implementation/execution of the foundation might vary in accordance with the state and organization approach.

A. Excavations: Excavation is the initial stage of construction. Furthermore, excavation is the procedure of eradicating/removing unneeded soil mass out of its initial/primary/original spot. Eradicated/Removed soil mass is needed for grade fill or back fill. Excavation is usually pit excavation, trench excavation, and Bulk excavation. Excavation is carried out in accordance with the engineering report or in accordance with Engineer recommendations/suggestions.

B. Anti-Termite Treatment: Termite control is the next measure of implementing/ carrying out/executing the shallow foundation on construction site. Subsequent to the excavation compaction is carried out on the foundations planes/surfaces.

C. Shuttering: Shuttering is carried out on the entire rims/sides of the foundations for concreting as well as needed form.

Excavations are carried out as a minimum one foot additional from the real/actual length and width of the foundation due to simple positioning as well as eradication/removing of shuttering.

D. Polythene sheet: That is the 3rd measure of procedure of implementation of work at the site. Furthermore, polythene sheet is placed on the ground surface subsequent to the Anti termite treatment. The dimension of polythene sheet goes from/ranges from two mm to six mm thick.

E. Plain cement Concrete [P.C.C.]: Plain cement is the combination of sand, aggregate and cement with no reinforcement. Furthermore, in implementation/ execution of foundation task, the concrete Grade utilized is:

Concrete Grade = M 7.5
Concrete Proportion = 1:4:8
One equal to cement
Two equal to fine aggregate
Four equal to Coarse aggregate

Quantity of water in litre needed cement content as well as water cement ratio. Furthermore, the PCC thickness is ten cm.

F. Operation/Implementation of Reinforcement: During/in foundation task/work, reinforcement is offered in the two directions. 1 direction bar is main bar as well as other direction bar is Binders or distribution bar.

The Reinforcement is withstands by the concrete cover blocks Furthermore, the cover least thickness to major reinforcement may not/shall not be below 50 mm to direct contact/surface contact with the ground surface/land surface.

To get more detail, go through the following link civilfieldwork.blogspot.com

In what way to conduct the Function of Shallow Foundation Task at construction site