Construction Process of a Curved Concrete Wall

The concrete wall aims to keep the left/remaining soil in AN elevated as well as sloping region.

A concrete wall is usually constructed of solid concrete, though concrete blocks could even be used to get reduce expensive construction works/masonry work, mainly once it has to be inclined/bent.

Underneath are a few useful tips for constructing a retaining wall along with a curve single-handed.

Measure A: Systematize the region

The concrete retaining wall should be placed in a trench. Label the region through stakes, and after that attach a string amid them. Compute the implanted region length and denote the required concrete retaining wall height.

On the basis of such numbers, buy the quantity of blocks that fulfils the requirements.

  • Compute the blocks width
  • Finish the demarcation work in the region through staking the width
  • Complete the length for a three D (3D) figure/representation.

Fill/tamp the place and verify the depth. Do the required alterations. Leave/drop a solo layer of gravel and after that fill it until it turns out to be even.

Measure B: Put blocks

The moment the trench is cleared/cleaned and dug up/excavated, the blocks should be organized appropriately. Set the initial block within the trench; confirm it is robust against the sides.

Furthermore verify to keep an appropriate level. In case that is not the instance, strike/hit it lightly through the mallet until it turns out to be even.

Measure C: Form Cuts

Since the concrete retaining wall is constructed on a curve, it is required to change the concrete blocks to suit/fit the curve. Furthermore, the chain is going to function like a guide to verify wherein the curves are and how distant the block is. By means of a marker, monitor/follow the string curvature on the block. Remove the block out of the trench.

Measure D: Reinforce the basic elements/fundamentals

Fill the region wherein the wall is identified, until the soil is securely filled/packed around the base. Furthermore, pour gravel into the block centres as a result it's in the middle/half the way/halfway up. Arrange the subsequent blocks level, confirm they are at equal height which they meet/match those underneath. Furthermore, cut them to go well with pro re nata and stuff/fill them through gravel. Replicate the technique until the specific height is attained, after that close the blocks.